MCVSD - COMMUNICATIONS HIGH SCHOOL - HVAC DESIGN SERVICES
LOCATION: WALL TOWNSHIP, NJ
CLIENT: MONMOUTH COUNTY VOCATIONAL SCHOOL DISTRICT
MARKET SECTOR: EDUCATION
SIZE: (67,500 sf Existing School / Approximately 280 Students)
THE OPPORTUNITY
PS&S provided design services to replace the HVAC system at the existing Communications High School located in Wall Township, New Jersey. Services included architecture, MEP, structural, and cost estimating services.
THE CHALLENGE
PS&S previously performed an evaluation for the existing HVAC system in the building.
The HVAC system was serviced by a water source heat pump system to heat and cool the
building. Heat pumps and a
cooling tower are approximately twenty years old and at the end of their expected useful
life according to ASHRAE’s Equipment Life Expectancy.
The new system selected during the evaluation phase does not rely on one
major piece of equipment to operate, so the risk did not exist for the entire system to be
down in the event of a failure. The proposed system was designed to work with existing
infrastructure while minimizing major building changes.
THE PS&S SOLUTION
PS&S considered four system options.
The water heat pumps with variable refrigerant flow (VRF) systems was selected as the preferred design option and
included replacing condenser water heat pumps with refrigerant, split-type heat pumps,
and replacing undersized split type heat pumps and ERVs with a new VRF system,
including dedicated outdoor air systems (DOAS). All proposed units would handle the
current heating and cooling loads based on current use functions within the building.
Some units were resized to meet current code and changes in use within the building.
Construction was simplified into two phases to meet budget constraints and occupancy
requirements of the District.
The project budget was estimated to be $4.0 Mil. The bids were competitive and allowed
the base bid and 5 alternate bid items to be awarded for a total cost of $3.56 Mil including
boiler, Kitchen Make-Up Air and Exhaust Units, and the building management control
system for the building. The project was bid during the COVID-19 pandemic which required
modifications to the bid opening process and procedures during bidding administration.
The PS&S teams’ efforts and attention to detail allowed the project to be awarded within
the schedule constraints