Corporate mandates across the pharmaceutical industry have set energy performance goals with ever increasing demands. This scenario has challenged site engineering teams to prepare and execute plans to achieve these goals. Initiatives invariably involve different improvements or modifications to the site Chilled Water Systems. Alternatives abound, system arrangement characteristics, equipment efficiencies, free cooling, variable flows and VFDs are all in the mix.